Concrete
Heavy and rigid. Check seams, lids and shell condition.
Installation and replacement both need an approved design. A larger tank cannot make unsuitable soil work.
Georgia starts at 1,000 gallons for 1–4 bedrooms, then adds 250 per additional bedroom. A garbage grinder increases capacity requirements by 50%.
Start with the actual tank record. Georgia’s base residential minimums are:
| Bedrooms | Base tank | Important limit |
|---|---|---|
| 1–4 | 1,000 gallons | Approved design may require more |
| 5 | 1,250 gallons | Add 250 gallons per bedroom above four |
| 6 | 1,500 gallons | Garbage grinder: increase required capacity by 50% |
Heavy and rigid. Check seams, lids and shell condition.
Lighter. Proper support, fittings and installation matter.
Lightweight. Follow approved backfill and groundwater requirements.
A tank stores and separates waste. The field provides soil treatment; both need to suit the property.
Georgia’s connection rules consider sewer within 200 feet of the property line or in an abutting public right-of-way.
Soil depth, seasonal water, slope and usable field area shape the design.
Conventional, chamber, pump-dosed and advanced systems have different site and maintenance needs.
Provide the proposed use, bedroom count, site plan, water sources and required soil information.
Use an appropriately certified installer and keep the final approval and layout.
Practical answers for Macon homes and businesses.
No. A conventional tank and field can work where the site is suitable. A distribution pump is different from an aerobic treatment unit.
No. Bedrooms, approved use, equipment and site conditions determine the system requirements.
Tell us where you are, what is happening and the service you need.